Hello,
I had to perform a Megger insulation resistance test recently on a single phase step voltage regulator and the first part of the procedure had us bond all three bushings together. I can’t find a clear explanation as to why all three bushing (Source, Load, and Source Load bushing) need to be bonded together. Red lead (hot) connected to the source bushing and black lead connected to ground. The Megger is set to PI and we run the test for 10 min to saturate the winding fully.