hey all
just kinda curious what methods the community uses to connect test leads (doble,ttr,megger,WR) to the high side of a transformer with load break elbows.
Ive always gotta use a loadbreak elbow probe which has nothing to attach the hook to. I attach an alligator clip to the end of the probe and connect to that. Im sure there's something better out there.