    Hi all

    Can anybody guide me that what data need to be collected from Utility Side and for Each and every equipment in Substation for ARC FLASH and Short Circuit Coordination study and how to fill up the 1584 Sheet ?

    Regards

    Sami

  2. #2
  3. Join Date
    Apr 2017
    Posts
    15
    Reputation

    Utility

    Quote Originally Posted by mask1290 View Post
    Hi all

    Can anybody guide me that what data need to be collected from Utility Side and for Each and every equipment in Substation for ARC FLASH and Short Circuit Coordination study and how to fill up the 1584 Sheet ?

    Regards

    Sami
    You will have to write a letter and request from the Utility company their short circuit contribution on the electrical system.

  4. #3
  5. Join Date
    Jun 2017
    Posts
    2
    Reputation
    Needed Utility Information:

    1. Three-phase short circuit MVA and X/R ratio at the transformer primary for each incoming service if they are different.

    3-Phase MVAsc _______________

    X/R Ratio __________

    2. Single line-to-ground short circuit MVA and X/R ratio at the transformer primary for each incoming service if they are different.

    SLG MVAsc _______________

    X/R Ratio __________

    3. Nominal, lowest, and highest kV at the point of service during the last 2 years.

    4. Phase Overcurrent Relay for each service:
    Manufacturer and Type:
    CT and Settings:
    (If protective device is fuse, please provide fuse Type and Size.)

    5. Ground Overcurrent Relay for each service:
    Manufacturer and Type:
    CT and Settings:

    6. If there is transformers belonging to utility, please provide following information for each transformer:
    Transformer rating:
    Impedance:
    Type of cooling (OA/FA?)
    Temperature rating (55 C/65 C?)
    Connection type.

Subscribe

Share this thread

Related Topics

  1. Here's why you should always short a CT secondary
    By SecondGen in forum Safety and Arc Flash Talk
    Replies: 8
    Last Post: January 31, 2021, 10:26 AM
  2. Arc Flash Tables vs Arc Flash Studies
    By mnmurphy in forum Safety and Arc Flash Talk
    Replies: 0
    Last Post: March 26, 2015, 09:40 PM

Tags for this Thread

Follow us


Explore TestGuy


NETA Certification Training


NICET Electrical Power Testing


Help and Support




You are viewing the archives. Enjoy new features and join the conversation at wiki.testguy.net