    Reputation

    Minimum discharge time recommended at the end of cable testing

    What is the minimum discharge time recommended at the end of cable testing?

  2. #2
  3. gchoquette is offline Junior Member Pro Subscriber
    Join Date
    Mar 2019
    Posts
    22
    Reputation
    Quote Originally Posted by epenland View Post
    What is the minimum discharge time recommended at the end of cable testing?
    I faintly remember 10 minutes, but I think this is incorrect. I believe that you are supposed to use a grounding stick and discharge the cable that way.

    Please correct me if I am wrong.

  4. #3
  5. michaellabeit's Avatar
    michaellabeit is offline
    NETA Level 2
    Junior Member Pro Subscriber
    Join Date
    Apr 2020
    Location
    North Carolina
    Posts
    14
    Reputation
    Quote Originally Posted by epenland View Post
    What is the minimum discharge time recommended at the end of cable testing?
    If I remember correctly, DC and AC tests charge cables differently so the discharging time will depend on the type of test conducted. Megger states the following with regard to DC insulation resistance testing: "It is very important that capacitance be discharged, both before and after an insulation resistance test. It should be discharged for a period about four times as long as test voltage was applied in a previous test." In their DC hipot testing slides NETA states the same thing: discharging should last 4 times the test interval.

    However, if you're conducting AC hipot testing, either at 50/60 Hz or VLF the discharging shouldn't take nearly as long.

Subscribe

Share this thread

Related Topics

  1. Tan Delta versus Partial Discharge testing on cables
    By TaifaEngineering in forum Electrical Testing Talk
    Replies: 5
    Last Post: July 14, 2021, 10:50 AM
  2. Cable hi-pot withstanding time, why 15 minutes?
    By moon1958moon in forum Electrical Testing Talk
    Replies: 31
    Last Post: April 16, 2019, 06:37 PM
  3. long time delay primary injection testing
    By KLLU26 in forum Electrical Testing Talk
    Replies: 3
    Last Post: April 4, 2019, 10:52 AM
  4. Minimum discharge time at end of cable test
    By Cldpmu in forum NETA Level 2 Exam
    Replies: 3
    Last Post: December 21, 2018, 10:08 PM
  5. Recommended Industry Training?
    By tonym1069 in forum Electrical Testing Talk
    Replies: 3
    Last Post: September 16, 2016, 08:40 AM
Follow us


Explore TestGuy


NETA Certification Training


NICET Electrical Power Testing


Help and Support




You are viewing the archives. Enjoy new features and join the conversation at wiki.testguy.net