hi,
wanted to know whats the loopback expected value for the lower slope and the upper slope is if the phase CT correction value=2.
in the manual it doesn't show any value but its effecting the expected value as per manual.
hi,
wanted to know whats the loopback expected value for the lower slope and the upper slope is if the phase CT correction value=2.
in the manual it doesn't show any value but its effecting the expected value as per manual.